variances
英 [ˈveərɪənsɪz]
美 [ˈvɛriənsɪz]
n. 变化幅度; 差额
variance的复数
柯林斯词典
- PHRASE (与…)不一致,相矛盾
If one thing isat variance withanother, the two things seem to contradict each other.- Many of his statements were at variance with the facts...
他的说法有很多和事实不符。 - This idealistic concept is at variance with reality.
这种理想主义的观念和现实相矛盾。
- Many of his statements were at variance with the facts...
- N-VAR 差异;不同
Thevariancebetween things is the difference between them.- ...the variances in the stock price.
股票价格的变化 - ...total revenue variance.
总收入的差异
- ...the variances in the stock price.
双语例句
- The system reports variances against these standard costs when invoices are entered against suppliers for the goods received.
当输入收到商品的发票时,webERP会报告新的成本与标准成本的差异。 - Also, price and efficiency variances often are linked; in such cases, the total effect on the company's costs is moire meaningful than are individual variances.
另外,价格和效率差异经常存在一定联系,在这种情况下,研究公司成本的总影响比单独研究个别差异更有意义。 - Compare planned cost variances to actual cost variances.
将计划成本差异与实际成本差异进行比较。 - The budget variance analysis column can be set up on how you review the budget variances.
预算差异分析这一列可以根据您查看预算差异的方式来设置。 - The engine has electronically controlled fuel injection and ignition which adjust automatically to cater for variances in fuel quality.
ROCAM发动机有电子控制燃油喷射和迎合燃油质量变化的自动调整点火正时。 - Averages, standard deviations, and variances are not supported when a PivotTable report has calculated items.
在数据透视表有计算项时,平均值、标准偏差和方差计算不被支持。 - Reported on variances in quarterly costing reports.
在季度费用报告中报告变动。 - The variances in trade balance due to variation in the macro variables as well as the exchange rate change are examined by Impulse Response Functions and Variance Decomposition methods.
同时,我们还利用冲击响应函数和方差分解的方法,来分析由于宏观经济变量以及汇率变化带来的贸易差额的方差。 - Both cost and effort are random variables whose variances will reduce over the lifecycle of the project.
成本和工作是随机变量,需要在项目生命周期中减少它们的方差。 - Static budget variances are differences between actual results and corresponding amounts ( revenues and expenses) in the static budget.
固定预算差异是实际结果与预算结果(收入和费用)之间的差异。